Paper
21 November 1995 Just-enough-information: a new paradigm for production scheduling in a manufacturing supply network
David D. Grossman, Peter M. Will, Mirza Mohd Sufyan Beg, Victor D. Lee
Author Affiliations +
Abstract
In manufacturing supply networks today, companies are separated by boundaries through which little or no production information flows. Existing production scheduling and inventory control paradigms are not efficient for supply networks of autonomous competing companies, because production information is proprietary and control is sovereign. What is needed to achieve production optimization across the network is a new paradigm for operational control, based on the exchange of Just-Enough-Information (JEI). We have invented a Demand- Availability-Order (DAO) algorithm that creates a `pull' system distributed recursively across computers in a supply network, with each company using only local information. We believe that DAO is the key to JEI. Practical application depends on generalizing DAO and on complementing it with a broad range of related systems.
© (1995) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
David D. Grossman, Peter M. Will, Mirza Mohd Sufyan Beg, and Victor D. Lee "Just-enough-information: a new paradigm for production scheduling in a manufacturing supply network", Proc. SPIE 2596, Modeling, Simulation, and Control Technologies for Manufacturing, (21 November 1995); https://doi.org/10.1117/12.227220
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Manufacturing

Safety

Computing systems

Control systems

Distributed computing

Manufacturing equipment

Astatine

Back to Top