Paper
25 August 1998 Present status of the GTC installations design
German R. Pescador, Javier Serrano
Author Affiliations +
Abstract
The maximum exploitation of the excellent astronomical quality of the `Roque de los Muchachos' Observatory is one of the most important design criteria for the GTC Project. The installations of the GTC are being designed in such a way as to minimize local seeing degradation while providing adequate support for the operation and maintenance of the facility. The paper will firstly describe the options that have been adopted as a solution for specific subsystems of the installations, such as: the dome, the auxiliary service areas or the thermal control, with special attention to the environmental conditions in the telescope chamber. Other subjects discussed are: the solutions proposed to minimize the possibility of turbulent surface-layer air negatively affecting astronomical observations; the minimization of wind-induced telescope vibrations and transmission of vibrations between the separate foundations of the buildings and the telescope pier through the ground; the guidelines to carry out the tasks of operating and maintaining the GTC and of course, the solutions for protection against adverse weather conditions.
© (1998) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
German R. Pescador and Javier Serrano "Present status of the GTC installations design", Proc. SPIE 3352, Advanced Technology Optical/IR Telescopes VI, (25 August 1998); https://doi.org/10.1117/12.319270
Lens.org Logo
CITATIONS
Cited by 1 scholarly publication.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Telescopes

Space telescopes

Buildings

Domes

Optical instrument design

Astronomical telescopes

Astronomy

RELATED CONTENT

Progress on the New York State Observatory a new...
Proceedings of SPIE (July 22 2014)
Detail design and construction plans for a dome for the...
Proceedings of SPIE (August 05 2010)
The test of the 10k x 10k CCD for Antarctic...
Proceedings of SPIE (September 24 2012)
Project management of an imaging optical interferometer
Proceedings of SPIE (June 26 2006)
Outrigger telescopes for narrow-angle astrometry
Proceedings of SPIE (September 28 2004)
Design of the Discovery Channel Telescope enclosure
Proceedings of SPIE (September 28 2004)

Back to Top