Paper
4 February 2003 Project VISTA: a review of its progress and overview of the current program
Author Affiliations +
Abstract
The Visible and Infrared Survey Telescope for Astronomy (VISTA) project started in 2000 following a Joint Infrastructure Fund award (JIF) to a consortium of 18 UK Universities . The JIF proposal was for a 4 metre class telescope with the ability to mount a visible and an infrared wide field camera. The UK Astronomy Technology Centre successfully tendered for the management of the project of developing and building the telescope in two phases. The initial phase was intended to review the proposed design and carry out a conceptual study. The second phase being the development, manufacture and commissioning of this design. As a result of the first phase, a conceptual design based on an f/1 primary mirror telescope and cold baffle IR camera has been developed. The IR Camera focal plane has been sized to accommodate sixteen 2k × 2k IR detectors, putting VISTA at the forefront of IR Survey Astronomy. The project team have developed this conceptual design into formal ITT's to allow the design and manufacture to commence. The telescope will be sited at the ESO Observatory in Paranal and is due for completion in 2006.
© (2003) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Alistair M. McPherson, Simon C. Craig, and Will Sutherland "Project VISTA: a review of its progress and overview of the current program", Proc. SPIE 4837, Large Ground-based Telescopes, (4 February 2003); https://doi.org/10.1117/12.458235
Lens.org Logo
CITATIONS
Cited by 8 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Telescopes

Infrared cameras

Cameras

Mirrors

Infrared telescopes

Optical instrument design

Visible radiation

RELATED CONTENT

The VISTA project a review of its progress and...
Proceedings of SPIE (September 28 2004)
Integrated approach to the design of a 4 m survey...
Proceedings of SPIE (July 30 2002)
Optical design concept of the 4 m visible and infrared...
Proceedings of SPIE (January 30 2003)
From 250 to 90 tons systems engineering in the...
Proceedings of SPIE (February 04 2003)
Status of VISTA systems and engineering design
Proceedings of SPIE (August 02 2000)
Visible and Infrared Survey Telescope for Astronomy: overview
Proceedings of SPIE (December 24 2002)
VISTA: project status
Proceedings of SPIE (June 23 2006)

Back to Top