Paper
28 July 2008 SIM-Lite: status of the engineering progress toward flight
Author Affiliations +
Abstract
We present an overview of the ongoing progress towards flight readiness of the SIM project. We summarize the engineering milestones that have been completed in the last two years, namely: the Brass-Board Internal and External Metrology Beam Launchers, the Brass-Board Metrology Source, and the Instrument Communication Hardware/Software Architecture Demonstration. We also show other progress such as: the life test of the bass-screw and PZT actuators, building the Metrology Fiducials and the Single Strut Test Article. We status the ongoing work on the Brass-Board Fast Steering Mirror and the Brass-Board Astrometric Beam Combiner. We end with a proposed path towards finishing the Brass-Board suite.
© (2008) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Frank G. Dekens, Eric E. Bloemhof, Serge Dubovitsky, Daniel Eldred, Renaud Goullioud, Muthu Jeganathan, Fabien Nicaise, and Feng Zhao "SIM-Lite: status of the engineering progress toward flight", Proc. SPIE 7013, Optical and Infrared Interferometry, 70134U (28 July 2008); https://doi.org/10.1117/12.789828
Lens.org Logo
CITATIONS
Cited by 2 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Metrology

Sensors

Interferometers

Actuators

Ferroelectric materials

Mirrors

Electronics

Back to Top