The mission D1 is the first complete SL mission in the framework of the German Manned Space Program. This Mission will be under the mission management responsibility of the German Space Agency DFVLR. Its primary objective is to support basic and applied research in the following fields: materials processing, fluid physics, medicine, biology, botany. A further mission objective is to test: instrument reflyability (reuse of FSLP equipment, efficiency of crew operations in space and economies possible in crew operations. An important spin-off will be establishment of the management capability to implement and control complex manned space programs. This paper describes how the D1 project is implemented under German mission management responsibility. The major project tasks as they will be performed using German facilities, in particular all D1 unique aspects, will be addressed.
© (1982) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Gunther Brandt "D1 Mission Project Implementation", Proc. SPIE 0284, NASA-ESA Spacelab Systems and Programs, (1 February 1982); https://doi.org/10.1117/12.965782
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Space operations

System integration

Computing systems

Materials science

Stereolithography

Aerospace engineering

Control systems

Back to Top