2 August 2000 Assembly and integration to first light of the four VLT telescopes
Author Affiliations +
Abstract
The design, manufacture and construction of the four 8 m VLT telescopes has been a major endeavor of the European Southern Observatory and European astronomy over the past twenty years. The final stages of this project, the assembly, integration and verification of the succession of four 8 m Unit Telescopes in the last three years, is the culmination of this great project. The successful achievement of this activity has been the result of a carefully planned campaign, using the best of telescope building methods developed on other projects over many years.
© (2000) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Peter M. Gray "Assembly and integration to first light of the four VLT telescopes", Proc. SPIE 4004, Telescope Structures, Enclosures, Controls, Assembly/Integration/Validation, and Commissioning, (2 August 2000); https://doi.org/10.1117/12.393913
Lens.org Logo
CITATIONS
Cited by 2 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Telescopes

Mirrors

Control systems

Computer programming

Manufacturing

Coating

Optical instrument design

RELATED CONTENT

Hubble Space Telescope Fine Guidance Sensor Control System
Proceedings of SPIE (September 26 1989)
Coude Auxiliary Telescope (CAT) A Low Cost Telescope At...
Proceedings of SPIE (November 16 1982)
Status of the Magellan Project
Proceedings of SPIE (June 01 1994)
LSST Telescope mount and pier design overview
Proceedings of SPIE (July 28 2010)

Back to Top