Paper
13 September 2012 Testing JWST's proposal planning system: early progress
I. J. E. Jordan, A. Patterson, W. DePriest, D. C. Taylor, R. Downes, W. Kinzel
Author Affiliations +
Abstract
The observer program implementation, planning, and scheduling subsystems are undergoing software development for the James Webb Space Telescope front-end ground segment and are being tested in an integrated fashion. This part of the ground system leverages what was developed and fine-tuned for the Hubble Space Telescope over previous decades. This paper will describe the testing design, methods, results, plus the current capabilities and elements still to be developed for these subsystems through the time of publication. We will point out elements from Hubble's systems, from an operations perspective, which have been preserved for the new telescope, and those which require redevelopment.
© (2012) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
I. J. E. Jordan, A. Patterson, W. DePriest, D. C. Taylor, R. Downes, and W. Kinzel "Testing JWST's proposal planning system: early progress", Proc. SPIE 8448, Observatory Operations: Strategies, Processes, and Systems IV, 844806 (13 September 2012); https://doi.org/10.1117/12.926943
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
James Webb Space Telescope

Software development

Databases

Virtual point source

Space telescopes

Imaging spectroscopy

Observatories

Back to Top