12 May 2015 Status of PAL-XFEL
Author Affiliations +
Abstract
The PAL-XFEL, a 0.1-nm hard X-ray FEL facility consisting of a 10-GeV S-band linac, is being constructed in Pohang, South Korea. Its building construction was completed at the end of 2014. The major procurement contracts were complete for the critical components of S-band linac modules and undulators. The installation of linac, undulator, and beam line will be completed by 2015. The commissioning will get started in January 2016 aiming for the first lasing in 2016. We will report the current status, construction progress, and commissioning plans for the PAL XFEL project, including major subsystem preparations.
© (2015) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
H.-S. Kang, K.-W. Kim, and I. S. Ko "Status of PAL-XFEL", Proc. SPIE 9512, Advances in X-ray Free-Electron Lasers Instrumentation III, 95120P (12 May 2015); https://doi.org/10.1117/12.2183141
Lens.org Logo
CITATIONS
Cited by 7 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
S band

Free electron lasers

Modulators

Waveguides

Electron beams

Hard x-rays

Magnetism

Back to Top